Back Service page

Anti-corrosion floor paint construction

It is a floor paint with strong anti-penetration, resistance to strong acids, alkalis, salts and various organic solvents, high surface hardness and good density.

  • R

    Strong adhesion, high hardness, can withstand long-term rolling by forklifts and trucks

  • R

    Severe corrosion resistance, strong acid and alkali resistance, chemical solvent resistance

  • R

    Scope of application: floors, walls and equipment surfaces in electroplating plants, battery plants, chemical plants, electrolytic cells, pharmaceutical plants, acid-base neutralization cells, etc.

  • 01.

    High Quality

    We are manufacturers and suppliers of industrial floor paints, coatings, concrete floor repair materials and maintenance products.

  • 02.

    Professional Construction

    We have professional technicians and skilled construction personnel who will provide you with perfect quality projects.

  • 03.

    (Design solution) Technical support

    According to customer needs and comprehensive consideration of various ground factors, we provide scientific and effective engineering design solutions.

  • 04.

    After-Sale Warranty

    All floor paint construction projects undertaken by our company enjoy free maintenance for one year.

Project application of anticorrosive floor paint

We have provided cost-effective construction solutions since 2010

Anti-corrosion fiberglass vinyl floor paint

The project belongs to one of the refining and processing areas of the oil factory.

  • R

    Step1

    Waterproof the floor;

  • R

    Step2

    Keep the floor well patched, polished, dusted and clean;

  • R

    Step3

    Apply one or two coats of epoxy primer with strong penetration and adhesion to improve the strength and adhesion of the floor;

  • R

    Step4

    Use a vinyl resin with strong adhesion and add an appropriate amount of diluent to roll it on to enhance the adhesion between the floor and the fiberglass cloth;

  • R

    Step5

    Place the fiberglass cloth flat, adhere the fiberglass cloth to the ground with the prepared vinyl ester mid-coat, and use a trowel to smooth the vinyl ester mid-coat to make the surface uniform. Apply one to three layers as needed;

  • R

    Step6

    Use a trowel to evenly apply the prepared vinyl ester primer on the fiberglass cloth one or two times;

  • R

    Step7

    Apply the prepared vinyl ester self-leveling paint evenly with a trowel or roll it twice with vinyl ester topcoat to make the entire floor bright, clean and uniform in color;

  • R

    Step8

    Only pedestrians can walk after 24 hours, heavy loads can be applied after 72 hours, and it can be put into use after 7 days. (Based on 25℃, the low temperature opening time needs to be appropriately extended, and the floor should not be exposed to water during the maintenance period)

Heavy corrosion resistant floor paint

The project is part of a processing area of ​​a large chemical plant.

  • R

    Step1

    Waterproof the floor;

  • R

    Step2

    Keep the floor well patched, polished, dusted and clean;

  • R

    Step3

    Apply one or two coats of epoxy primer with strong penetration and adhesion to improve the strength and adhesion of the floor;

  • R

    Step4

    Use a special anti-corrosion primer with strong sealing and bonding properties to roll on once to enhance the adhesion between the ground and the fiberglass cloth;

  • R

    Step5

    Place the fiberglass cloth flat, adhere the fiberglass cloth to the ground with the prepared special anti-corrosion mid-coat, and apply the special anti-corrosion mid-coat evenly to enhance the toughness of the ground. This needs to be done one to three times;

  • R

    Step6

    Add appropriate amount of quartz sand to the special epoxy mid-coat and apply it evenly one to three times;

  • R

    Step7

    Apply two to three times according to actual needs, and the surface should be smooth and without holes;

  • R

    Step8

    Use a special anti-corrosion paint to roll twice, and the color must be uniform;

  • R

    Step9

    Use a special anti-corrosion self-leveling paint to apply it once. After completion, the entire floor will be bright, clean and uniform in color.

  • R

    Step10

    Only pedestrians can walk after 24 hours, heavy pressure can be applied after 72 hours, and normal use can be carried out after 7 days of construction. (Based on 25℃, the low temperature opening time needs to be appropriately extended, and the floor should not be exposed to water during the maintenance period)

Have any Questions? Call us Today!

+86 13549311182

Have any Questions? Email Today!

cp751029@126.com

We Provide You With The Best Construction Services

High-quality floor paints, professional construction personnel, and rich experience allow us to clearly know how to provide you with dust-free, wear-resistant surfaces and long-lasting floor solutions.

High Quality

We are manufacturers and suppliers of industrial floor paints, coatings, concrete floor repair materials and maintenance products.

Professional Construction

We have professional technicians and skilled construction personnel who will provide you with perfect quality projects.

Technical support(Design solution)

According to customer needs and comprehensive consideration of various ground factors, we provide scientific and effective engineering design solutions.

After-Sale Warranty

All floor paint construction projects undertaken by our company enjoy free maintenance for one year.

Let’s talk to us!

We are Providing Peronalized and high quality services.

Have you any Upcoming Projects?